BSBPMG511 | Summative Assessment 2 | Project Management

  • Based on the scenario project, utilise the templates provided to produce a product description development outline, scope statement, scope management plan and scope change control system development checklist and worksheet.

[googlepdf url=”https://assignmentquestion4me.com/wp-content/uploads/2018/07/3-1.pdf” width=”100%” height=”400″ ]

Leave a Reply